Scheduled delivery date of Wednesday the 25th!
I took Wednesday off from work, so I'm all set to rock from Wednesday until Saturday Afternoon when I go back to work at 3pm!
|
Scheduled delivery date of Wednesday the 25th!
I took Wednesday off from work, so I'm all set to rock from Wednesday until Saturday Afternoon when I go back to work at 3pm!
~Nick
Visit my website!
I hope you realize you're now on the hook for another round of detailed and interesting setup and tweak posts as well as listening impressions.
-Jim
I'm pooped. Just finished rearranging my audio components to the front corner of the room, re-positioning a few things on the front soundstage, and rewiring all my 5 main channels due to the fact that the audio rack was moved. I'm all ready for my sub tomorrow! Gotta work tonight (11-7) and then I'm off until Saturday (3-11). I was put on the overtime list today too. Hopefully I can drum some extra cash up so I can finally get a projector...
Only one bummer, I dont have an RCA cable long enough to reach my little temporary 13" TV sitting next to my center channel... hmmm....
~Nick
Visit my website!
Sitting around waiting for the big brown box to drop off my big brown box...
~Nick
Visit my website!
And we're waiting with you!
Are you going to use the second channel of the BFD to EQ the new sub seperately, or are you going to use a single channel(or both channels combined) and EQ the two subs as one?
-curtis
I'll be using one channel to calibrate both. The Y is after the EQ.
He better not make me wait by coming at 5:30 or something...
~Nick
Visit my website!
FedEx, UPS, and USPS almost always come at the end of the day for me. Hope you have a better schedule.
-curtis
I need to go get a couple more concrete pavers. The sub is on the left side of the front soundstage now, but my camera needs a wideangle lens to capture the full front wall so I colocated them for a quick picture. Kick-@$$!
~Nick
Visit my website!